NEA, Jorpati Distribution Center

HT/LT line and pole shifting works at Kageshwori Manohara Na. Pa.Ward No.5 Bastekodhik Kapurbase Sadak,Gajarkote Sinkhadagaun Sadak, Bastekodhik Dumakhal Marga Tole area . F/Y 2079/080, 6.552

BIRENDRA HOSPITAL

Supply and Installation of Manual Load Change over Switch and Distribution Panel Board

NEA, Kulekhani First Hydropower Station

Supply, Delivery, Installing, Testing and Commissioning of Ducted Type Packaged Air Conditioner (Cooling Capacity: 40,000 kcal/h, Heating Capacity: 34,400kcal/h)