ताजा समाचार
- Request for Quotation- Media Mobilization MRED : Consultancy Service for Strategic Media Engagement for Policy Advocacy and Advancing the Mercy Corp’s MRED Model in Disaster Risk Reduction and Management in Nepal |
- Request for Quotation- Outsourcing Cleaning Service |
- Auction of Mortgage Property (लिलाम तथा बिक्री) |
- Tender Notice Renewal of Microsoft 365 Business Basic License |
- Quotation Notice Pad Vending Machine ( Resika Trade Circle Pvt Ltd) |
- Tender Notice Supply & Delivery of Medicine and Surgical Items |
- Tender Notice Supply & Delivery of Sanitary Pad |
- Tender Notice Maintenance of Road, Construction of Bridge |
- Request for Proposal (RFP) Insurance of Office Vehicle and Group Personal Accidental Insurance for Staff |
- Renewal of Next Generation Firewall ( Palo Alto) |
- Procurement of Medicine for Health Posts (2081/82), BMC |
- Procurement of pesticides |
- The Procurement oF Supply & Delivery of Two Wheeler Vehicle |
- Tender Notice Procurement of Data Warehouse/ Data Lake and Data Visualization Tool |
‘निर्माण’ सम्बन्धी प्रकाशित सम्पूर्ण ठेक्का टेन्डर तथा बोलपत्र सुचनाहरु प्रदेश अनुसार 13/02/2024 (Tuesday )
February 13 , 2024
१ फाल्गुन २०८०, मंगलवार
To View EGP Bid Documents; विद्युतिय खरीद प्रणालीमा प्रकाशित बोलपत्रहरु Document published in EGP PPMO CLICK HERE;
यो पनी हेर्नु होला : Suggestion
सार्वजनिक खरिद अनुगमन कार्यालय विद्युतिय खरीद प्रणाली EGP मा प्रकाशित बोलपत्रहरु । Bids from electronic procurement (EGP) system, Bolpatra.gov.np/egp
EGP Construction related bid |
|||||||
S.N. | Caller's Name and Address | Items/Services | Published Date | Source | Submission Date | View Document | |
---|---|---|---|---|---|---|---|
1 | Banganga Municipality Office | Excavation and Extraction of Natural River bed material, sand, gravel and boulder of Banganga Khola 1 (Bhaglapur and Bankasiya) | 12/02/2024 | PPMO | 14/03/2024 | Click Here | |
2 | Banganga Municipality Office | Excavation and Extraction of Natural River bed material, sand, gravel and boulder of Banganga Khola 2 (Madhuban) | 12/02/2024 | PPMO | 14/03/2024 | Click Here | |
3 | Banganga Municipality Office | Excavation and Extraction of Natural River bed material, sand, gravel and boulder of Banganga Khola 3 (Dhaneshpur and Gherawa) | 12/02/2024 | PPMO | 14/03/2024 | Click Here | |
4 | Banganga Municipality Office | Excavation and Extraction of Natural River bed material, sand, gravel and boulder of Koili Khola 1 (Khojipur, Jinuwa and Bardahawa) | 12/02/2024 | PPMO | 14/03/2024 | Click Here | |
5 | Banganga Municipality Office | Excavation and Extraction of Natural River bed material, sand, gravel and boulder of Koili Khola 2 (Dhaireni Danda) | 12/02/2024 | PPMO | 14/03/2024 | Click Here | |
6 | Banganga Municipality Office | Excavation and Extraction of Natural River bed material, sand, gravel and boulder of Dhiri Khola 1 (Baksispur) | 12/02/2024 | PPMO | 14/03/2024 | Click Here | |
7 | Banganga Municipality Office | Excavation and Extraction of Natural River bed material, sand, gravel and boulder of Dhiri Khola 2 (Bhalwad and Salghari) | 12/02/2024 | PPMO | 14/03/2024 | Click Here | |
8 | Infrastructure Development Office, Baglung | Construction of Rumta Khola Motorable Bridge, Jaimini 9 & 10 | 12/02/2024 | PPMO | 14/03/2024 | Click Here | |
9 | Infrastructure Development Office, Baglung | Upgrading of Majuwa Nepane Kayas Bhujunge Thulathar, Galkot Municipality 06 | 12/02/2024 | PPMO | 14/03/2024 | Click Here | |
10 | KMC Ward 16 | RCC Road Construction Work at Inner Road at Bahatipokhari, Rashtriya Mirgaula Kendra to Sub-Station Road and Sub Road of Mehpi Jana Marga, KMC-16 | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
11 | Nepal Water Supply Corporation, Janakpur | Hdpe pipeline (110,90&63mm) extension works with Interconnection at different places inside janakpurdham | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
12 | Janajyoti Secondary School, Bhimad-6 | "Construction of different sections of Janajyoti Secondary school " | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
13 | Kawasoti Muncipality | Thakali Chowk Dekhi Magarkot Jane Bato Marmat | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
14 | Shivasatakashi Municipality Office Jhapa | Construction of Nagar Smart School | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
15 | Infrastructure Development Office Kavrepalanchok | Upgrading works on Haveli Saping Simthali Bangesimal Bafal Road, Bhumlu RM, Chainage: 0+000 to 3+750 | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
16 | Bharatpur Metropolitian City Office | Construction of gate truss building and Mandir at Gunjanagar Green Park,BMC-18 | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
17 | Bharatpur Metropolitian City Office | Construction of Different road of Ward no 23,BMC-23 | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
18 | Infrastructure Development Office Kavrepalanchok | Upgrading works of Kathmandu Kattike Churithumka Sipaghat Chautara Balefi Road ( Kavre Section), Mandandeupur Municipality, Chainage: 2+000 to 14+571 | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
19 | Infrastructure Development Office Kavrepalanchok | Upgrading works on Janmukti Marg (Taaldhunga-Sikredovan-Jhurjhure Section), Khanikhola Gapa, Chainage: 0+000 to 4+000 | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
20 | Infrastructure Development Office Kavrepalanchok | Construction of Andheri Khola Bridge, Roshi - 3, Roshi Rural municipality. | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
21 | Dhawalagiri Rural Municipality, Myagdi | Maschim Siwang Hilapokhari Ek Ghar Ek Dhara Construction Works, DRM-07, Takam | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
22 | Bhume Rural Municipality, Rukum (East) | Construction of Administrative Office Building Of Bhume Rural Municipality | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
23 | Sisne Rural Municipality, Rukum (East) | Chowkbazar-Pakhagaun-Serakhet Sewer Line Project | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
24 | Health Office, Bajura | construction of multipurpose ayurvedic hospital with yoga hall budhinanda-1 bajura | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
25 | Infrastructure Development Office, Kalikot | Kalika Ma.Bi Dekhi Bam Tol Hudai Trisuli Pachaljharana 5,Kalikot | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
26 | Infrastructure Development Office, Kalikot | Kayar Dewa rara Paretakiya Road Construction | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
27 | Infrastructure Development Office, Kalikot | Kayar Dewa rara Paretakiya Road Construction | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
28 | Infrastructure Development Office, Kalikot | Construction of Kartike Khola Khet Phapre Khola Pul, Gangajamuna Rural municipality-05, Dhading | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
29 | Infrastructure Development Office Lalitpur | Dubechaur Bhimsensthan Sanokholsi Road, Nagarjun-8, Kathmandu | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
30 | Urban Development and Building Office, Baitadi | Construction Of Parigaun Talighar Musekhola RCC Drain Khaptad Chhanna Ga.Pa. 5, Bajhang | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
31 | Urban Development and Building Office, Baitadi | Management And Beautification Of Mellac Bazar Chhabispathivera Gaa.Pa. 2, Bajhang. | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
32 | Urban Development and Building Office, Baitadi | Construction Of Shivalaya RCC Building Melauli Na.Pa - 02,Baitadi. | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
33 | Pipra Rural Municipality,Mahottari | Construction of Bholhi Pokhari market management infrastructure and beautification works at ward no. 4, pipra rural Municipality | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
34 | Integrated Energy and Irrigation Special Program | Construction of 200 mm (8�) dia. Investigation Tubewell along the Tamakoshi River Corridor | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
35 | Integrated Energy and Irrigation Special Program | Construction of 200 mm (8�) dia. Investigation Tubewell along the Bagmati River Basin | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
36 | Integrated Energy and Irrigation Special Program | Construction of 200 mm (8�) dia. Investigation Tubewell along the Bheri River Corridor | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
37 | Integrated Energy and Irrigation Special Program | Construction of 200 mm (8�) dia. Investigation Tubewell along the East Rapti River Corridor by Rotary/Percussion Method. | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
38 | Office of Rural Municipality Kapurkot ,salyan | Kapurkot Krishi Hatbazarko Purbadhar Bistar Tatha Starunnati Yojana | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
39 | Khulalu-Salisalla road project,Kolti Bajura | Construction of Belly Bridge (1*48.8 m) Over Baddigad khola at Piluchaur,Bajura. | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
40 | Ministry of Agriculture and Livestock Development,Bagamati Province | Construction of Fence Wall at Nuwakot | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
41 | Ministry of Agriculture and Livestock Development,Bagamati Province | Construction of fence wall in Langtang national park, Rasuwa | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
42 | Ministry of Agriculture and Livestock Development,Bagamati Province | Construction of RCC wall at Buffer area of chitwan national park | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
43 | Dadeldhura Hospital | Construction of Mortuary Building at Dadeldhura Hospital | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
44 | Nepal Bank Limited | Construction of City Office Nepalgunj Branch, Banke Office Building | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
45 | Water Resource and Irrigation Development Division Office, Syangja District, Gandaki Province | Andhikhola River Training Works (Aandhikhola Rural Municipality, Putalibazar Municipality & Bhirkot ) | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
46 | Water Resource and Irrigation Development Division Office, Syangja District, Gandaki Province | Aadhikhola River Training Works | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
47 | Maharajgunj Nursing Campus | Construction of Generator House & Installation of 62.5 KVA Diesel Generator | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
48 | Nepal Water Supply Corporation,Branch Dhangadhi | Deep Tube Well Drilling & Installation Work | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
49 | Office of Dhurkot Rural Municipality, Dhurkot Jaisithok, Gulmi | Construction Work of Borbot Thuldi Nayagau Netekateri Okhaldhunga Road (Scheme-01) at Dhurkot Rural Municipality-1 & 4,Gulmi | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
50 | Office of Dhurkot Rural Municipality, Dhurkot Jaisithok, Gulmi | Construction Work of Borbot Area Ditthapokhara Kimmukharka Thyapche Road (Scheme-01) at Dhurkot Rural Municipality-4,5,6 & 7, Gulmi | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
51 | Office of Dhurkot Rural Municipality, Dhurkot Jaisithok, Gulmi | Construction Work of Lohori Abuwa Aarupata Patankhola Sadak Tatha Udina Pipaldhara Nadi Sadak (Scheme-01) at Dhurkot Rural Municipality-2 & 3, Gulmi | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
52 | Office of Madane Rural Municipality | Narikotdeurali Patalkateri Baghakhor Bajhakateri Sirseni Deurali Road | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
53 | Malika Rural Municiplality | Construction of Tourism Infrastructure for Lekhpokhara-Deurali-Malika | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
54 | Shivraj Municipality, Office of the Municipal Executive, Chandrauta | Construction of office building ward no 1 | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
55 | Shivraj Municipality, Office of the Municipal Executive, Chandrauta | Construction of office building ward no 11 | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
56 | Tirahut Rural Municipality Goithi, Saptari | construction of tirahut ward no 2 office building | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
57 | Tirahut Rural Municipality Goithi, Saptari | Construction of Blacktop Road with Drain in Tirahut ga.pa.3 piparahi tole hudai uttartir warda no 5 ko lohajarako bhindwar tole hudai utter pati mandal toleko hanuman mandir samma kalopatre sadak tatha nala nirman, Tirahut Rural Municipality,Saptari | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
58 | Thatikandh Rural Municapality | Inchi Tallo Bheripatal Jaymichaur Dhamigau Pipalchautara Darga Khanepani Nirman Yojan Karmagat Thatikandh Gaupalika Ward No 04,03 Dailekh | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
59 | Thasang Rural Municipality | Lyankukhola RCC Tatabandha ra Prachin Aetihasik Sanskritik mahatwako Narsang gumbama Compound wall nirman | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
60 | Thasang Rural Municipality | Jhongo Krishi Sadak Yojana | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
61 | Thasang Rural Municipality | Ghattekhola belibridge dekhi naurikot hundai larjung jane bato staronnati | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
62 | Thasang Rural Municipality | Thasang Dhampusangu Fulung Sadak | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
63 | Tinpatan Rural Municipality, Sindhil | Ma.Vi.Lampan Batase Prabhidhak Kakshaa Sanchalan Ra Prashasanik Bhawan Nirman | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
64 | Urban Development and Building Office, Makawanpur | Asphalt laying, overlaying works, drain works and other Road Improvement works at Ratnanagar-01, 09, & 10; Chitwan a) Aayurvedic hospital drain works, b) Ojha chowk kaparphori road improvement, c)Sichai gate to kaparphori road improvement, d) Gopal parajuli to shivakanta paudel to keshav kadariya's house road improvement. | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
65 | Urban Development and Building Office, Makawanpur | Asphalt laying, overlaying and other Road Improvement works at bharatpur-15 & 18; Chitwan a)Dhiraj dawadi's house to north mohan gurung house's to Nahar syphon black top , b) Ghimire chowk to biswanath, lekali chowk 6 no to dahal chowk black top , c) Biswa aryal's house to shiva aryal house black top. | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
66 | Urban Development and Building Office, Makawanpur | Asphalt laying, overlaying works, and other Road Improvement works at bharatpur-05, 07& 11; Chitwan, a)Bunsichowk dekhi gaurijung blacktop, b)Chelinepal dekhi paschim bunsichowk hudai om santichowk drain walls, c)Ananda marg no 8 sundartole krishnapur road blacktop, d)upakar marg blacktop. | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
67 | Urban Development and Building Office, Makawanpur | Road improvement Works on Kairihani-2 a) Juna Dallakoti ko Ghar Dekhi Paschim b) KashiGau Dekhi 1 No. Simana Samma Sadak | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
68 | Waling Municipality, Office of Municipal Executive | Waling Nagarpalika Bharika Khanyapani Ka Mul Rekhankang Gudastar Parechhed Garnya Pani Recharged Pardali, Sana Kuwa Tatha Mul Samrached Karya Waling 1,2,9,11 And 12 | 12/02/2024 | PPMO | 13/03/2024 | Click Here | |
69 | Hatuwagadhi Rural Municipality | Homtang Gorujure Dekhi Salleri Hudai Sunbaluwa sadak marmat | 12/02/2024 | PPMO | 12/03/2024 | Click Here | |
70 | Gaindakot Municipality, Office of Municipal Executive | River Bed material Stock pile Selling | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
71 | Gaindakot Municipality, Office of Municipal Executive | Stock pile Selling (Stock pile-2) | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
72 | Belaka Municipality Office, Rampur Udayapur | Revenue Collection from selling price of extraction of river related material of Pathra River (Ward no. 2) Area facilitated by IEE for FY 2080/081 | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
73 | 504 Road Division, Mahendranagar | Site clearance (Hazardous Tree Cutting) Work along Mahendra Highway (CH 1010+000 to 1027+000) | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
74 | Belaka Municipality Office, Rampur Udayapur | Revenue Collection from selling price of extraction of river related material of Kosopa River (Ward no. 8) and Kothu River (Ward no. 8) Area facilitated by IEE for FY 2080/081 | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
75 | Bhumikasthan Municipality | Pipalneta Fulbari Motorable Road (Firfire Section) | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
76 | Bhumikasthan Municipality | Pauwa Field Compound Fencing and Gate Construction Works. | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
77 | Bhumikasthan Municipality | Aairawati Gaighat Trail Bridge Construction Works. | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
78 | Bhumikasthan Municipality | Kaudilya Gufa Motorable Road Construction | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
79 | Bhumikasthan Municipality | Nuwakot Hatiya to Kot Road and Kot Maintenance Works. | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
80 | Dhangadhi Sub-Metropolitan City | Construction of Fencing Works at Segregation Center Ward No. 02 DSMC | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
81 | NEA, Dhalkebar Grid | Slope and Tower Protection Works for Tower no 107 Khimti-Dhalkebar 220kV Transmission Line. | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
82 | Health Office, Bajura | Construction of Toilet Bathroom and spread of Spred of blocks around health office building . | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
83 | Birbhadra Jung Coy | Construction of water supply structures | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
84 | NEA, Jumla Distribution Center | HT/LT Line Extension work in Tatopani Rural Muncipality & Sinja Rural Muncipality. | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
85 | Panini Rural Municipality | Procurement of Construction works of Community building Urleni, Dhatibang-6 | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
86 | Panini Rural Municipality | Procurement of Upgrading of different road of Dhatibang | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
87 | NEA, Butwal Grid Division | Tower Protection work at Tower Number 401 (Bardghat-Kawasoti) | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
88 | Shuklaphanta Municipality, Kanchanpur | Collection of Internal Revenue from extraction of construction materials from gaudi khola ward no 8 | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
89 | Nepal Oil Corporation Ltd, Fuel Depot Nepalgunj | Construction of one storey building with store room and changing room for field officer | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
90 | Urban Development and Building Office, Baitadi | Rithapatha Basti Bikas Tatha Purbadhar Nirman Ja.Na.Pa. 9, Bajhang . | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
91 | Urban Development and Building Office, Baitadi | Construction of RCC Road Shailyashikhar muncipility 09 Darchula. | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
92 | Urban Development and Building Office, Baitadi | Construction of PCC Road and Mohoti Dhalnikash Mahakali Municipality ,05 Bharani -Darchula. | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
93 | Urban Development and Building Office, Baitadi | RCC Pavement Works towards Shree Ma.Vi. Bhimphedi-07, Kogate, Makawanpur | 12/02/2024 | PPMO | 27/02/2024 | Click Here | |
94 | Katari Municipality | Extraction and Collection of River-basin Materials (Stone, Gravel and Sand) from Tawa Khola (Ward no. 7) and Baijyanath Khola (Ward no. 6) � Package 1 | 12/02/2024 | PPMO | 26/02/2024 | Click Here | |
95 | Katari Municipality | Extraction and Collection of River-basin Materials (Stone, Gravel and Sand) from Tawa Khola (Ward no. 3, 4 and 5) � Package 2 | 12/02/2024 | PPMO | 26/02/2024 | Click Here | |
96 | Katari Municipality | Extraction and Collection of River-basin Materials (Stone, Gravel and Sand) from Tawa Khola (Ward no. 2), Belsot Khola (Ward no. 1) and Kamala Khola (Ward no. 3) � Package 3 | 12/02/2024 | PPMO | 26/02/2024 | Click Here | |
If you have any questions about your account or any other matter, please feel free to contact us at info@tradenep.com or by phone at +977 1 4540 957, +977 1 4523 158, +977 9818892553 Thank You |
This will close in 0 seconds